Posts
- Thermosiphon unit for Outdoor Cabinets (April 7, 2026)
- TEC Air Conditioner for Outdoor Cabinets (April 7, 2026)
- VGA LCD KVM Switch (April 7, 2026)
- Battery Monitoring Host (April 7, 2026)
- Rack Unit Asset Monitoring Host (April 7, 2026)
- emperature & Humidity Sensor (April 7, 2026)
- Integrated Data Collector (April 7, 2026)
- Aisle Modular Data Center (March 30, 2026)
- Smart Cabinet (March 30, 2026)
- Row Modular Data Center (March 30, 2026)
- Prefabricated Container Data Center (March 30, 2026)
- Liquid Cooling Data Center (March 30, 2026)
- Cabinet Static Transfer Switch (March 20, 2026)
- Multi-functional Outdoor Enclosure (March 20, 2026)
- Utility Power Distribution Cabinet (March 20, 2026)
- Server Rack Cabinet (March 20, 2026)
- Lithium Iron Phosphate Battery, 48V (March 20, 2026)
- GEL Battery, 12V (March 20, 2026)
- AGM Battery, 2V (March 20, 2026)
- Fixed Smart Busbar System (March 20, 2026)
- Sliding Smart Busbar System (March 20, 2026)
- Rack Mount Static Transfer Switch (March 20, 2026)
- Functional Rack Power Distribution Units (March 20, 2026)
- Telecom DC Power System (March 19, 2026)
- Online High-Frequency UPS, 10kVA-60kVA (March 19, 2026)
- Online High-Frequency UPS, 1kVA-10kVA (March 19, 2026)
- Online Industial Low-Frequency UPS (March 19, 2026)
- Online Modular UPS, 60kVA-200kVA (March 19, 2026)
- Online Modular UPS, 80kVA-600kVA (March 19, 2026)
- Online Modular UPS, 400kVA-1600kVA (March 19, 2026)
- Wall-Mounted Pumped Refrigerant Cooling System (March 19, 2026)
- Rack Bottom/Middle Cooling System, 3.5kW (March 19, 2026)
- Top-mount Rack Cooling System, 2.5kW – 5.5kW (March 19, 2026)
- Rack Cooling System, 3.5kW-12.5kW (March 19, 2026)
- Chilled-Water In-Row Cooling System, 28.9kW – 65.8kW (March 19, 2026)
- Air-cooled In-Row Cooling System, 5.6kW–10.8kW (March 19, 2026)
- Air-cooled In-Row Cooling System, 5.6kW–90.1kW (March 19, 2026)
- Liquid Cooling Cabinet (March 19, 2026)
- Room CDU Coolant Distribution Unit (March 19, 2026)
- In-Row CDU Coolant Distribution Unit (March 19, 2026)
- Rack CDU Coolant Distribution Unit (March 19, 2026)
- Hybrid CDU Coolant Distribution Unit (March 19, 2026)
- Liquid-to-Air Rack CDU Coolant Distribution Unit (March 19, 2026)
- Rack Manifold for Liquid Cooling Solutions (March 19, 2026)
- Quick Disconnect Coupling for Liquid Cooling Solutions (March 19, 2026)
- Secondary Loop for Liquid Cooling Solutions (March 19, 2026)
- Chilled-water Room Cooling System,38.2kW–265.8kW (March 19, 2026)
- Air-cooled Room Cooling System, 7.5kW-27.5kW (March 19, 2026)
- Air-cooled Room Cooling System, 32.5kW-120kW (March 19, 2026)
- Modular Fanwall Cooling, 150.1kW-300.1kW (March 19, 2026)
- Soeteck Receives ISO 14001 Certification for Sustainable Manufacturing Practices (March 10, 2026)
- Soeteck Expands Manufacturing Capacity in SEA to Meet Growing Hyperscale Demand (March 10, 2026)
- Soeteck Unveils Next-Gen AICoolit Immersion Cooling System at Data Center World Asia (March 10, 2026)
- Lithium-ion vs. VRLA: ROI Analysis for Modern Data Center UPS Systems (March 10, 2026)
- How Micro-Modules are Transforming 5G Edge Computing in Southeast Asia (March 10, 2026)
- Immersion vs. Cold Plate: Choosing the Right Liquid Cooling for AI Clusters (March 10, 2026)
Pages
- Site Map (April 10, 2026)
- Cookie Policy (April 3, 2026)
- Terms of Use (April 3, 2026)
- About us (March 17, 2026)
- Contact us (March 10, 2026)
- Home (March 10, 2026)
- Privacy Policy (March 5, 2026)
